Using mobile tower crane to suit the required load of the concrete pieces the cut concrete pieces will be lifted lowered to the ground by using the steel chain that will be connected to the two cores done in each piece.
Concrete saw cutting method statement.
The column will be cut 150x150x150 one meter down from top from all edges to fix the bow shackles for holding the column with tower crane.
18 panania ave panania nsw 2213 position.
3 common methods of cutting concrete 1.
0425 323 261 fax.
Therefore the timing of saw cuts is critical.
The method statement includes a safe work procedure and control measures which you can edit and add your project details.
Before any concrete cutting or drilling starts on site appropriate planning and preparation are necessary to ensure the work can be done safely.
A safe work method statement swms should be prepared.
Pulleys for guiding diamond disk blade will be installed.
02 9792 6605 signed.
The cuts should be made at a predetermined spacing and only after the concrete has obtained sufficient strength but before internal cracking begins.
In some areas of the country it is also called slab sawing since horizontal installations of concrete are often referred to as slabs of concrete.
The chamakos group pty ltd this swms has been developed and.
Prior to start cutting the marking will be done on the existing concrete columns.
Concrete wall cutting this process is used for the cutting of openings in vertical surfaces and surfaces with slopes so great that flat saws cannot be used.
Planning and coordination must involve consultation with those engaged in the work and any health and safety representatives hsrs 1.
This swms covers high risk construction work hrcw controls related to.
Slab sawing also known as flat sawing slab sawing is a technique used to cut flat surfaces like floors driveways.
This concrete saw core drilling safe work method statement swms covers hazards and controls when using a hand held electric or petrol diesel powered concrete saw and core drill.
Contractors sometimes use this.
T a arthur s concrete cutting approved by.
Saw cuts are a used to create control joints in concrete which help control where cracking occurs due to shrinkage.
29 146 730 154 date.
Concrete slab sawing concrete flat sawing is the most identified diamond cutting method.
This concrete cutting method statement template has been prepared and pre completed for concrete cutting using a cut off saw concrete cutter.
Arthur s concrete cutting swms page 1 of 6 safe work method statement company name.
Wall sawing as the name implies wall sawing is a method for cutting through walls.