Insert the pipe until it hits a notch at the halfway point which correctly seats the pipe.
Connection of sewer to floor.
Sewer line clean out.
006 typical house connection hmua san 006 007 cleanout riser cover hmua san 007 008 typical lateral saddle tap connection hmua san 008 009 joining pipes with flexible couplings hmua san 009 010 sanitary sewer utility crossing hmua san 010 011 pvc sanitary sewer trench detail hmua san 011 012 inside drop connection hmua san 012.
It is usually found in a cap or hub mounted to a 3 to 4 inch diameter pipe that rises out of a slab floor in a basement or utility area.
This typically occurs when the public sewer is 8 which a size no longer legal as a public sewer in nyc and a 6 connection is required.
If nothing drains into the floor drain prevent sewer odor by pouring a pitcher of water down the drain every couple of weeks.
Sewer line installation in floor joists.
Spread some petroleum jelly on the pipe face as a lubricant and push the coupling onto one of the pipes.
Your home s drainage system carries water and waste from fixtures and appliances to an underground drain line that leads to the main sewer.
For y junction connection diameter and material of drain line shall follow that of the sewer it is connecting to for manhole connection diameter of drain line shall be minimum 200mm and no upvc is allowed saddle connection to cipp lined sewer pipe is not allowed sewer connection.
Illicit connections may be intentional or may be unknown to the business owner or homeowner and often are due to the connection of floor drains to the storm sewer system.
Sometimes it is mounted flush into the floor.
The plumbing contractor must notify pwd wtr at 215 397 7097 at least 48 hours before connection to schedule the inspection of the sewer connection.
The connections to the city s sewer lines must be inspected by a pwd wtr inspector from the beginning to the end of the connection installation.
Fold in sewer connection when the city sewer is only one size larger than the connection size required and no spur exists a sewer contractor must fold in a new spur in most cases.