You don t want to begin the process and then determine that the buildings foundation isn t strong enough.
Concrete structural floor second level.
F numbers were developed in the 1980s to provide a systematic quantitative way to indicate the flatness and levelness of a concrete floor.
Installing the concrete floors.
The pouring and finishing process should only take a few days and once the concrete is dry you can have your concrete floors polished or coated to match your interior design.
You may want to have a structural engineer evaluate your space.
An example is lite deck which costs around 3 25 sqft of floor surface for the form.
You can level an existing concrete floor with a leveling layer of new concrete but you must prepare the old concrete floor first.
I need to use concrete to level the floor on a second floor apartment.
When done correctly a leveling layer of concrete increases the longevity.
I am exploring concrete floors on the main level over basement to get some mass into the space.
If you plan on leveling a concrete floor you can do so with relative ease by using a leveling compound.
Neglecting to prepare the old surface will prevent the new concrete from adhering correctly resulting in a weak bond between the two layers.
You can easily have the gargae floor a step below the upper living area if desired.
They would be stained and sealed to create the finished floor.
Floor flatness levelnessone of the things that distinguishes a high tolerance floor is its f number requirement.
If an engineer found no structural issues you may be able to level the floor by applying a cement based self leveling floor product such as henry level.
Some areas are changing or eliminating the floor elevation difference codes.
It is recommended to only add a concrete floor if the installation has been well planned.
The answered by a verified structural engineer.
I am researching the use of icf style forms that would allow a free span from wall to wall and eliminate the wood floor structure all together.
Occupied spaces under concrete floor construction are very common.
The first floor foundation and second floor framing needs to be very strong.
The reason for the code requirement is the attempt to protect the people behind a wood wall.
Once the foundation bearing walls and support beams are deemed sufficient a professional can come in and begin pouring the concrete.
A second story with occupied rooms will obviously weigh more than your old roof system did so engineers will need to calculate how much weight the main floor walls and foundation will carry as well as how best to hold that weight up.